Pelco Translator Board TXB-AD User Manual Page 11

  • Download
  • Add to my manuals
  • Print
  • Page
    / 32
  • Table of contents
  • TROUBLESHOOTING
  • BOOKMARKS
  • Rated. / 5. Based on customer reviews
Page view 10
C1492M-I (8/05) 11
Figure 7.
Receiver Location
3. Set DIP switches on the TXB-AD. Refer to Figure 6 and Table A.
4. Install the TXB-AD board. Refer to Figure 8 and Figure 9 and do the following:
a. Open the hinged door to the back box. Push the tab lock towards the wall of the unit and
lift the door open.
b. Remove the shorting plug from the 16-pin connector located on the Spectra system’s
circuit board.
NOTE:
Do not discard the 16-pin shorting plug. Save the plug in case the system is converted back
to a Pelco-controlled unit.
c. Insert the TXB-AD translator into the 16-pin connector located on the dome system’s
circuit board.
d. Secure the translator board to the standoff on the interconnect circuit board using the
provided 4-40 (Spectra II) or 6-32 (Spectra III) screw and lock washer.
AMERICAN DYNAMICS
CONTROLLER
AMERICAN DYNAMICS
CONTROLLER
PTZ
PTZPTZPTZPTZPTZ
PTZ PTZ
PTZPTZPTZPTZ
LINE
1
LINE
1
LINE
2
LINE
3
LINE
4
LINE
5
LINE
2
LINE
3
LINE
4
LINE
5
RECEIVERS
EXAMPLE OF STAR CONFIGURATION WITH DAISY CHAIN
RECEIVERS
EXAMPLE OF DAISY-CHAIN CONFIGURATION
= TERMINATED = UNTERMINATED
LINES 1-5 MUST NOT TOTAL MORE THAN 4,000 FT (1,219 M)
Page view 10
1 2 ... 6 7 8 9 10 11 12 13 14 15 16 ... 31 32

Comments to this Manuals

No comments